National enabling stock is not facility adequacy
Five frozen production-system maps now carry the national Resource–Energy envelope while refusing to infer a system connection, process requirement, allocation or binding constraint.
v0.1 remains immutable.v0.2 is additive evidence closure, not a replacement of upstream stock.
Verifying release…Frozen upstream identities must match.
The unknown moved downstream
Loading verified finding.
National enabling stockSystem connectionProcess requirementFacility allocationAdequacy
Five three-stock conversion maps
Loading verified system index…