Ammonium perchlorate

A source-linked European profile of propulsion-grade ammonium perchlorate synthesis, conditioning, upstream dependence, qualification and expansion evidence.

Where can Europe synthesize and condition propulsion-grade ammonium perchlorate, and what evidence would establish qualified, expandable and uncommitted supply?
SB-SMP-0003Version 0.1.0MOVING CURRENTEvidence cutoff 2026-08-28EU-27 + United Kingdom + Norway + Switzerland + Serbia + Türkiye

A reported production baseline is visible; comparable capacity and available tonnes are not.

As of 2026-08-28
Comparable current AP capacityUNKNOWN

Current synthesis is directly evidenced at Toulouse and a June 2026 investigation reports a 5,000 t/y annual production baseline, but that output-like figure is not recast as current nameplate capacity.

Current merchant-oriented AP capacityUNKNOWN

ArianeGroup advertises AP products and logistics services, which establishes merchant orientation but not annual external capacity, uncommitted allocation or programme interchangeability.

Uncommitted qualified APUNKNOWN

The retained sources do not quantify current output, commitments, inventories, accepted alternative sources or allocatable customer-grade tonnage.

Capacity composition unavailable UNKNOWN

Comparable current annual AP capacity. Current synthesis is evidenced and a secondary source reports a 5,000 t/y annual-production baseline, but no retained source establishes a comparable current AP nameplate figure.

Inference boundary. Current synthesis is evidenced and a secondary source reports a 5,000 t/y annual-production baseline, but no retained source establishes a comparable current AP nameplate figure. The 5,000 t/y figure is secondary reporting of annual production, not independently observed output or confirmed capacity. The planned 3,000 t/y increment, historic 2012 observations, sodium-perchlorate consumption basis, destruction throughput and downstream propellant tonnage remain outside current capacity and available supply.
01 · Material role

The strategic object is qualified AP, not undifferentiated perchlorate tonnage.

The useful chain runs through precursor continuity, synthesis, particle control, formulation and motor acceptance.

  1. 01 · UpstreamSodium perchlorate + ammonium inputPrecursor continuity, purity, transport, storage and utilities.
  2. 02 · SynthesisReaction + crystallisationControlled synthesis and crystal-size production at an authorised site.
  3. 03 · ConditioningGrinding + blendingParticle size, shape and distribution prepared for a qualified formulation.
  4. 04 · Qualified outputAP → composite propellant → motorMixing, casting, curing and programme-specific motor qualification.

Propulsion-grade AP

Ammonium perchlorate is the oxidiser in conventional composite solid propellants used in civil launchers and military rocket motors; particle size, distribution, purity and accepted source remain part of the usable material definition.

Adjacent but distinct states

Commodity perchlorate salts, laboratory AP, waste AP, destruction throughput and downstream propellant tonnage are excluded from current propulsion-grade AP production. Synthesis, grinding, blending, storage, formulation and motor qualification remain distinct industrial states.

Profile scopeEU-27 + United Kingdom + Norway + Switzerland + Serbia + Türkiye. Exclusions: Russia; Belarus; Distributors without evidenced production or conditioning; Downstream motor or propellant plants unless needed to establish the AP dependency; Waste-treatment throughput presented as production capacity; Historic capacity values presented as current capacity. This is a bounded public-source map, not a complete census. Absence from the profile does not establish absence of capability, imports or qualified alternatives.
02 · European production base

Current synthesis is evidenced at Toulouse; conditioning and storage are separate nodes.

The map preserves each industrial function and keeps all undisclosed current quantities null.

ACTIVE_MERCHANT

Active merchant-facing
Current production or conditioning is evidenced and external sale or service is explicit; uncommitted volume is not implied.

ACTIVE_CAPTIVE

Active integrated or strategic
Current capability is evidenced inside an integrated or sovereign chain; exclusive captive use is not implied.

CONVERSION

Conversion
An existing industrial asset has a sourced conversion plan but accepted output is not yet evidenced.

PLANNED

Planned
A sourced project or programme exists without evidenced commissioned output.

LEGACY_INACTIVE

Legacy or inactive
Historic capability is retained for lineage but is excluded from the current footprint.

North · 66°NSouth · 35°NWest −12° → East 42°
  1. 1Toulouse AP synthesis site
    ArianeGroup
    FR · ACTIVE MERCHANT
  2. 2Toulouse AP expansion
    ArianeGroup
    FR · PLANNED
  3. 3Saint-Médard-en-Jalles Centre
    ArianeGroup
    FR · ACTIVE CAPTIVE
  4. 4Sainte-Hélène AP site
    ArianeGroup
    FR · ACTIVE CAPTIVE
  5. 5Sainte-Hélène sodium-perchlorate decoupling stock
    ArianeGroup
    FR · PLANNED
Schematic geographic plot, not a border map. Coordinates represent approximate site or city locations, not verified plant-gate points. National programmes without a resolved site are listed in the pipeline but are not assigned coordinates.

Active AP synthesis, conditioning and storage records

Site / controlProfile stateProduction roleCapacity evidenceMarket access
SITE

Toulouse AP synthesis site

France · ArianeGroup

ArianeGroup-operated French site; programme and customer allocation are undisclosed.AP-CLM-003AP-CLM-004AP-CLM-005AP-CLM-008AP-CLM-014AP-CLM-015AP-CLM-020
ACTIVE_MERCHANT

Current AP production and a public AP product offer are explicit; the profile does not infer uncommitted volume.

Synthesis and crystallisation of propulsion-grade ammonium perchlorate for civil and military solid propulsion. UNDISCLOSEDUNDISCLOSED Merchant-facing

ArianeGroup publishes an AP product specification and offers export, transport, storage and analysis support; customer allocation is undisclosed.

REPORTED
SITE

Saint-Médard-en-Jalles Centre

France · ArianeGroup

ArianeGroup-operated integrated propulsion site.AP-CLM-006AP-CLM-017
ACTIVE_CAPTIVE

Current AP transformation for the M51 chain is explicit; external conditioning services are not established.

Transformation and conditioning of ammonium perchlorate for M51 solid propellant, plus end-of-life treatment capability. UNDISCLOSEDUNDISCLOSED Integrated use

The retained source identifies M51-linked transformation and does not disclose external conditioning allocation.

REPORTED
SITE

Sainte-Hélène AP site

France · ArianeGroup

ArianeGroup-operated Seveso upper-tier establishment attached to Saint-Médard-en-Jalles Centre.AP-CLM-007
ACTIVE_CAPTIVE

The official filing reports authorised AP storage and mixing; it does not establish independent synthesis or merchant allocation.

Ammonium-perchlorate processing, mixing and strategic storage. UNDISCLOSEDUNDISCLOSED Integrated infrastructure

The retained official source describes an internal supply-resilience role, not external market access.

REPORTED
Capacity reading rule Current synthesis is evidenced and a secondary source reports a 5,000 t/y annual-production baseline, but no retained source establishes a comparable current AP nameplate figure. All current annual-capacity groups remain null/undisclosed. A June 2026 secondary report of 5,000 t/y annual production is retained as a claim rather than relabelled as nameplate. The reported 3,000 t/y planned increment and historic 2012 observations remain outside the current total.
03 · Market structure

Merchant orientation is visible, but allocation and qualified alternatives are not.

Product marketing, integrated programme use and uncommitted supply answer different questions.

Current merchant-oriented AP capacityUNKNOWN

ArianeGroup publishes a product specification, export-licensing support and transport services. The sources do not quantify external allocation or customer commitments.

Current integrated or strategic AP capacityUNKNOWN

The same industrial chain also supports Ariane and M51 applications and includes integrated conditioning and storage in Gironde; programme allocation is undisclosed.

Current strategic finding · INFERRED

The bounded current map identifies one directly evidenced propulsion-grade AP synthesis site at Toulouse and separate conditioning or storage infrastructure around Saint-Médard and Sainte-Hélène. A June 2026 investigation reports a 5,000 t/y annual-production baseline, but it is not independently confirmed as current output or nameplate and says nothing about allocation. The evidence supports a concentration signal, not a quantified shortage finding.

  • The producer search is bounded rather than exhaustive.
  • The strongest Europe-wide producer statement in the official source is rooted in historic evidence.
  • Product availability and internal programme use do not disclose allocatable tonnes.
  • Could reverse: Current authoritative evidence of additional qualified European AP synthesis
  • Could reverse: Current capacity and allocation records demonstrating diversified accepted headroom
  • Could reverse: Programme evidence showing rapid, low-friction substitution across motor formulations
Nearest disclosed intervention surfaceTwo intervention surfaces are visible but not commissioned in the retained evidence: a reported Toulouse annual-production rise from 5,000 to 8,000 t/y alongside an official construction permit, and a Sainte-Hélène proposal for two months of sodium-perchlorate decoupling stock based on 28 t/day consumption. Neither can yet be counted as accepted additional AP supply.
04 · Expansion pipeline

Toulouse has a reported 3,000 t/y expansion path and a separate upstream buffer project.

Permit existence, reported target capacity, commissioning and qualified output remain separate evidence states.

  1. PLANNED

    Toulouse AP expansion · France

    Secondary reporting describes annual production rising from 5,000 to 8,000 t/y; the official permit records 2,094 m² of new industrial surface but no process capacity.

    AP-CLM-020AP-CLM-021
  2. PLANNED

    Sainte-Hélène sodium-perchlorate decoupling stock · France

    Proposed two-month sodium-perchlorate decoupling stock based on a reported 28 t/day consumption assumption.

    AP-CLM-011AP-CLM-019

Conversion and planned records

Site / controlProfile stateProduction roleCapacity stateMarket access
PROGRAMME

Toulouse AP expansion

France · ArianeGroup

ArianeGroup construction project evidenced by an official April 2026 permit and a June 2026 investigation of project documents.AP-CLM-020AP-CLM-021
PLANNED

The permit and reported annual-production target establish a live project; commissioning and accepted additional output are not evidenced.

A reported second AP production workshop associated with a planned 3,000 t/y increase in annual production. +3,000 t/y plannedMARKET ESTIMATEANNOUNCED TARGET Planned mixed use

The Toulouse production chain serves civil and military applications, but future project allocation and qualified grade mix are undisclosed.

REPORTED
PROGRAMME

Sainte-Hélène sodium-perchlorate decoupling stock

France · ArianeGroup

Company project described in a public regulatory notification.AP-CLM-011AP-CLM-019
PLANNED

The 2024 filing establishes the proposal and planning basis; current commissioning status is not retained.

Upstream sodium-perchlorate solution storage intended to protect Toulouse AP production against supplier interruption. UNDISCLOSEDUNDISCLOSED Not an AP sale

The project is an internal raw-material buffer and does not itself create merchant AP capacity.

REPORTED
Pipeline boundary A June 2026 investigation reports a Toulouse rise from approximately 5,000 to 8,000 t/y and an official April 2026 permit records new industrial surface, but neither source establishes commissioning. Separately, the 2024 Sainte-Hélène sodium-perchlorate filing is an upstream buffer, not AP nameplate.
05 · Dependencies & bottlenecks

Particle control and qualification sit between chemical tonnes and a usable motor grain.

Historic source qualification and current product specifications show why substitution cannot be reduced to formula identity.

REPORTED DEPENDENCY

Sodium-perchlorate continuity

ArianeGroup's 2024 filing describes sodium perchlorate as necessary to Toulouse AP production and proposes a two-month buffer; Arkema's current Jarrie profile separately identifies sodium perchlorate for Ariane rocket fuel.

AP-CLM-011AP-CLM-022
REPORTED GRADE GATE

Particle-size and distribution control

The product sheet distinguishes crystallised and ground sizes, controlled particle shape and custom distributions; formula identity alone does not establish formulation interchangeability.

AP-CLM-005
REPORTED INFRASTRUCTURE

Conditioning and storage

Saint-Médard and Sainte-Hélène perform transformation, processing or storage functions distinct from Toulouse synthesis.

AP-CLM-006AP-CLM-007
HISTORICALLY OBSERVED

Motor qualification after source change

ESA's 1995 account ties introduction of a European AP source to a booster qualification test before dual procurement became possible.

AP-CLM-012
REPORTED DEPENDENCY

Downstream formulation and casting

Official launcher sources place AP with aluminium and polybutadiene in composite solid propellant mixed and cast at the downstream plant.

AP-CLM-002AP-CLM-013
REPORTED CONSTRAINT

Hazardous-site authorisation

The Toulouse site operates under authorisation and Seveso upper-tier status, and an April 2026 permit records new industrial construction; neither source establishes commissioning or qualification lead time.

AP-CLM-008AP-CLM-021
accepted sodium-perchlorate inputauthorised synthesiscontrolled particle distributionsafe storage and transportformulation acceptancemotor qualificationuncommitted allocation
No European AP sufficiency scalar emittedThe retained evidence does not join current nameplate, actual output, imports, inventories, formulation compatibility, programme commitments and dated demand. One evidenced synthesis site is not itself proof of shortage, surplus or non-substitutability.
06 · Strategic assessment

The evidence supports a concentration finding, not a quantified shortage claim.

The next decision value comes from current capacity, allocation, accepted-source and transfer-time evidence.

V0.1 verdict · INFERRED

The bounded current map identifies one directly evidenced propulsion-grade AP synthesis site at Toulouse and separate conditioning or storage infrastructure around Saint-Médard and Sainte-Hélène. A June 2026 investigation reports a 5,000 t/y annual-production baseline, but it is not independently confirmed as current output or nameplate and says nothing about allocation. The evidence supports a concentration signal, not a quantified shortage finding.

INFERRED

Current strategic finding

The bounded current map identifies one directly evidenced propulsion-grade AP synthesis site at Toulouse and separate conditioning or storage infrastructure around Saint-Médard and Sainte-Hélène. A June 2026 investigation reports a 5,000 t/y annual-production baseline, but it is not independently confirmed as current output or nameplate and says nothing about allocation. The evidence supports a concentration signal, not a quantified shortage finding.

Confidence MEDIUM HIGH

AP-CLM-003AP-CLM-006AP-CLM-007AP-CLM-009AP-CLM-015AP-CLM-020
INFERRED

Nearest disclosed intervention surface

Two intervention surfaces are visible but not commissioned in the retained evidence: a reported Toulouse annual-production rise from 5,000 to 8,000 t/y alongside an official construction permit, and a Sainte-Hélène proposal for two months of sodium-perchlorate decoupling stock based on 28 t/day consumption. Neither can yet be counted as accepted additional AP supply.

Confidence HIGH ON PROJECT EXISTENCE LOW ON COMMISSIONING

AP-CLM-011AP-CLM-019AP-CLM-020AP-CLM-021
WITHHELD INSUFFICIENT EVIDENCE

Sufficiency determination

No Europe-wide AP surplus, deficit, bottleneck quantity or twelve-month motor-output loss is emitted because current supply, imports, qualified interchangeability, inventories, commitments and dated demand are not joined.

Confidence HIGH

AP-CLM-015AP-CLM-020
INFERRED

Qualification-friction finding

AP substitution is not safely modelled as tonne-for-tonne chemistry. Current product evidence exposes particle-size and distribution choices, while ESA's historic Ariane account shows a new European AP source passing through motor qualification before it enabled dual procurement.

Confidence HIGH ON MECHANISM LOW ON CURRENT DURATION

AP-CLM-005AP-CLM-012

Intervention points

  1. 01
    Close current Toulouse capacity and allocation

    Obtain current nameplate, actual output, utilisation, inventories, customer commitments and external allocation by AP grade and particle distribution.

    Decision value: Separates visible concentration from an actual twelve-month supply constraint.

    AP-CLM-003AP-CLM-005AP-CLM-015AP-CLM-020
  2. 02
    Verify both disclosed expansion surfaces

    Resolve construction and commissioning of the reported Toulouse 3,000 t/y increment and the Sainte-Hélène sodium-perchlorate store, including accepted output and usable inventory policy.

    Decision value: Separates permitted or proposed interventions from twelve-month qualified supply.

    AP-CLM-011AP-CLM-019AP-CLM-020AP-CLM-021
  3. 03
    Build the accepted-source matrix

    Map AP source, particle distribution, conditioning route and qualification status by European motor family without publishing sensitive formulation detail.

    Decision value: Identifies where a chemically available tonne is not a qualified tonne.

    AP-CLM-005AP-CLM-012
  4. 04
    Resolve alternative synthesis and imports

    Run bounded official, regulatory and company checks for current European AP synthesis and qualified non-European imports.

    Decision value: Can confirm or overturn the provisional one-site concentration reading.

    AP-CLM-009AP-CLM-015
  5. 05
    Separate synthesis from downstream throughput

    Join AP supply only to formulation-compatible mixing, casting, curing and motor acceptance records.

    Decision value: Prevents launcher or motor tonnes from being mistaken for upstream chemical capacity.

    AP-CLM-002AP-CLM-013

Evidence that can change the call

  1. 01
    Can Toulouse's reported 5,000 t/y annual-production baseline be independently confirmed, and what are nameplate, current output and utilisation by particle distribution?

    Would change: The current supply baseline and expansion headroom.

  2. 02
    How much current output is committed to Ariane, M51, tactical propulsion and external customers?

    Would change: The uncommitted merchant-supply finding.

  3. 03
    Which non-European sources and AP grades are already qualified for which European motor families?

    Would change: The concentration and substitution assessment.

  4. 04
    Was the Sainte-Hélène sodium-perchlorate decoupling store commissioned and filled?

    Would change: The upstream interruption-resilience finding.

  5. 05
    Which sodium-perchlorate suppliers, transport routes and inventory policies support Toulouse?

    Would change: The location and recoverability of the upstream constraint.

  6. 06
    When will the permitted Toulouse expansion commission, and what part of the reported 3,000 t/y increment will become accepted output?

    Would change: The expansion timeline, qualified increment and twelve-month intervention value.

  7. 07
    What AP inventories exist at conditioning, propellant and motor sites, with what shelf-life and acceptance state?

    Would change: The twelve-month disruption counterfactual.

Evidence descent · Appendix

Every number and conclusion runs back to an attributed record.

The page is a deterministic presentation of a repository-only, moving-current publication object. Corrections require a new version and revision-history entry; prior source objects remain in the repository. It creates no released Industrial Network row, migration, public JSON endpoint or new factual authority.

ConfirmedCompany estimateMarket estimateInferredUndisclosed
Profile-local scoped claims (20)
AP-CLM-001

The 2026 Common Military List of the European Union names ammonium perchlorate (CAS 7790-98-9) under ML8 oxidisers.

OBSERVED · Scope: EU military-list classification

Limitation: A control-list entry establishes regulated military relevance, not production, scarcity or programme use.

AP-SRC-001
AP-CLM-002

ESA describes Ariane 5 booster propellant as using ammonium perchlorate as oxidiser, aluminium powder as reducer and polybutadiene as binder.

REPORTED · Scope: Ariane 5 booster formulation role

Limitation: Ariane 5 is a historic civil-launcher example and does not disclose current European defence formulations.

AP-SRC-002
AP-CLM-003

ArianeGroup's current site profile states that Toulouse develops and produces ammonium perchlorate for solid-fuel engines including Ariane 6 and M51.

REPORTED · Scope: Current Toulouse production role

Limitation: The page does not publish annual capacity, output, utilisation or allocation.

AP-SRC-003
AP-CLM-004

ArianeGroup describes itself as a world leader in AP synthesis, crystallisation and characterisation and presents AP as a product for space and tactical propulsion.

REPORTED · Scope: Supplier capability and product positioning

Limitation: This is a first-party marketing claim and does not establish market share or Europe-wide exclusivity.

AP-SRC-004
AP-CLM-005

The ArianeGroup AP sheet specifies at least 99.5% assay, crystallised sizes of 200 and 400 micrometres, ground sizes of 3, 9, 20, 35 and 90 micrometres, controlled particle shape and custom distributions.

OBSERVED · Scope: Published AP product specification

Limitation: Published typical analysis does not establish every customer acceptance specification or batch conformance.

AP-SRC-004
AP-CLM-006

ArianeGroup states that Saint-Médard-en-Jalles Centre transforms the ammonium perchlorate needed for M51 solid propellant and that an attached Sainte-Hélène site processes and stores AP.

REPORTED · Scope: Current Gironde AP functions

Limitation: The site page does not publish throughput, exact process boundaries or external market access.

AP-SRC-003
AP-CLM-007

A June 2024 public regulatory filing describes Sainte-Hélène as a Seveso upper-tier establishment whose main activity is authorised ammonium-perchlorate storage and mixing.

REPORTED · Scope: Sainte-Hélène current regulatory operating context

Limitation: The filing does not disclose annual AP throughput or synthesis capability.

AP-SRC-007
AP-CLM-008

The French classified-installations register lists ArianeGroup Toulouse as operating with authorisation, Seveso upper-tier and authorised for ammonium perchlorate.

OBSERVED · Scope: Current Toulouse regulatory state

Limitation: An authorisation record does not establish current production quantity or expansion permission.

AP-SRC-005
AP-CLM-009

The INERIS substance profile, updated in 2024, retains an economic-data statement that predecessor Herakles was the only European AP manufacturer and produced at Toulouse.

REPORTED · Scope: Historic Europe-wide producer statement retained by an official technical portal

Limitation: The underlying manufacturer evidence is from 2012–2013; it does not prove that no other producer exists in 2026.

AP-SRC-006
AP-CLM-010

The same INERIS profile reports historic Toulouse installation capacity above 3,500 t/y and production around 3,000 t/y in 2012, while also citing a separate 4,000 t/y industry estimate.

REPORTED · Scope: Historic Toulouse capacity and output evidence

Limitation: The values are old, differ in scope and are not current capacity; the profile excludes them from current headline signals.

AP-SRC-006
AP-CLM-011

The 2024 Sainte-Hélène filing says sodium perchlorate is necessary for Toulouse AP production and proposes a two-month decoupling stock based on consumption of 28 tonnes per day.

REPORTED · Scope: Reported upstream resilience project and planning basis

Limitation: The 28 t/day value is a sodium-perchlorate consumption assumption, not AP output, and the source does not establish commissioning.

AP-SRC-007
AP-CLM-012

ESA reported in 1995 that an Ariane 5 solid-booster engine developed with a European SNPE AP source passed a qualification test, enabling dual procurement for future launches.

REPORTED · Scope: Historic AP source-change qualification mechanism

Limitation: The event does not quantify present-day qualification time or prove the same process for every missile motor.

AP-SRC-008
AP-CLM-013

CNES describes the Guiana Propellant Plant as mixing aluminium powder, ammonium perchlorate and polybutadiene resin before solid-motor integration.

REPORTED · Scope: Downstream European launcher propellant process

Limitation: The downstream process does not identify AP source, annual AP demand or defence-motor compatibility.

AP-SRC-009
AP-CLM-014

ArianeGroup's AP product sheet offers export-authorisation support, sea, road or rail transport, storage advice and sample analysis.

REPORTED · Scope: Published AP merchant-service capability

Limitation: Services and product availability do not establish uncommitted annual tonnage or acceptance by a new customer.

AP-SRC-004
AP-CLM-015

The retained current Toulouse site profile and AP product sheet establish production and a product channel but do not publish nameplate, independently confirm the secondary 5,000 t/y annual-production report or disclose uncommitted customer-grade supply.

INFERRED · Scope: Bounded current capacity and allocation check

Limitation: Non-disclosure in first-party sources is not proof that the secondary estimate is wrong or that the operator or authorities lack the data.

AP-SRC-003AP-SRC-004
AP-CLM-017

ArianeGroup reports that the Licorne facility at Saint-Médard can eliminate 300 tonnes of ammonium perchlorate per year.

REPORTED · Scope: End-of-life AP destruction throughput

Limitation: Destruction throughput is not production, current inventory or usable supply and is excluded from capacity totals.

AP-SRC-010
AP-CLM-019

The retained 2024 regulatory filing establishes a proposed sodium-perchlorate storage project but not its later commissioning state.

INFERRED · Scope: Bounded project-status check

Limitation: Absence of a commissioning record in the retained tranche is not evidence of cancellation or non-completion.

AP-SRC-007
AP-CLM-020

A June 2026 Mediacités investigation reports Toulouse annual AP production at 5,000 t/y and a project intended to raise it to 8,000 t/y, an increase of 3,000 t/y.

REPORTED · Scope: Reported Toulouse annual-production baseline and project target

Limitation: This is secondary reporting from project documents, not independently observed current output, confirmed nameplate, an audited company disclosure, commissioned capacity, accepted grade mix or uncommitted supply.

AP-SRC-011
AP-CLM-021

The official Sitadel permit row records an ArianeGroup construction authorisation at the Toulouse site on 9 April 2026 with 2,094 square metres of new industrial surface.

OBSERVED · Scope: Official Toulouse expansion construction record

Limitation: The permit row does not disclose AP process capacity, workshop-level surface, commissioning, output or qualification.

AP-SRC-012
AP-CLM-022

Arkema's current Jarrie site profile lists sodium perchlorate among its products and identifies it as an input used to manufacture Ariane rocket fuel.

OBSERVED · Scope: Current evidenced upstream sodium-perchlorate node

Limitation: The page's 350,000-tonne figure covers all products manufactured at Jarrie and is not sodium-perchlorate capacity, output or available allocation.

AP-SRC-013
Evidence passages (14)
AP-PASS-001

ML8.d.2 — oxidisers

The EU military list names AP, CAS 7790-98-9, among controlled oxidisers.

AP-SRC-001AP-CLM-001
AP-PASS-002

Ariane 5 boosters — propellant constituents

ESA assigns oxidiser, reducer and binder roles to AP, aluminium and polybutadiene.

AP-SRC-002AP-CLM-002
AP-PASS-003

Toulouse site section

The current facility page identifies Toulouse AP development and production for Ariane 6 and M51 but gives no annual tonnes.

AP-SRC-003AP-CLM-003AP-CLM-015
AP-PASS-004

Saint-Médard-en-Jalles Centre site section

The site page identifies M51-linked AP transformation and the attached Sainte-Hélène processing and storage site.

AP-SRC-003AP-CLM-006
AP-PASS-005

Pages 1–2 — product role, typical analysis and associated services

The product sheet covers AP synthesis, particle sizes and distribution, hazards, logistics and customer services without an annual capacity or allocation figure.

AP-SRC-004AP-CLM-004AP-CLM-005AP-CLM-014AP-CLM-015
AP-PASS-006

Establishment header and rubrique 4749

The official register marks the Toulouse establishment operating with authorisation, Seveso upper-tier and authorised for ammonium perchlorate.

AP-SRC-005AP-CLM-008
AP-PASS-007

Données économiques — production and capacity paragraphs

INERIS retains the historic sole-European-manufacturer statement and dated Toulouse capacity and production values.

AP-SRC-006AP-CLM-009AP-CLM-010
AP-PASS-008

Section 1 Introduction — current activities and project objective

The filing describes authorised AP storage and mixing and proposes a two-month sodium-perchlorate buffer based on 28 t/day to secure Toulouse production.

AP-SRC-007AP-CLM-007AP-CLM-011AP-CLM-019
AP-PASS-009

Paragraph 3 — European AP source and dual procurement

ESA links a satisfactory booster qualification test using European-source AP to future dual procurement.

AP-SRC-008AP-CLM-012
AP-PASS-010

Usine de Propergol de Guyane description

CNES describes mixing aluminium powder, AP and polybutadiene resin in the downstream solid-propellant plant.

AP-SRC-009AP-CLM-013
AP-PASS-011

Licorne biological treatment facility

ArianeGroup reports 300 t/y AP elimination capability at Saint-Médard, an end-of-life throughput distinct from production.

AP-SRC-010AP-CLM-017
AP-PASS-012

Article body — reported 5,000 t/y annual production and 8,000 t/y project target

The investigation reports annual production of 5,000 t/y and a project target of 8,000 t/y after a second workshop, a planned 3,000 t/y increase.

AP-SRC-011AP-CLM-020
AP-PASS-013

Permit 0315552500683 — decision date and industrial surface fields

The official row records authorisation on 9 April 2026 and 2,094 square metres of newly created industrial surface at the ArianeGroup address.

AP-SRC-012AP-CLM-021
AP-PASS-014

Jarrie production-site page — products and applications

Arkema lists sodium perchlorate at Jarrie and identifies it as an input for Ariane rocket fuel; the site's aggregate production figure is not product-specific.

AP-SRC-013AP-CLM-022
Public source register (13)
AP-SRC-001

Common Military List of the European Union adopted on 23 February 2026

Council of the European Union · 13 March 2026

OFFICIAL EU CONTROL LIST · accessed 2026-08-28

Open public source →
  • ML8.d.2 — oxidisersThe EU military list names AP, CAS 7790-98-9, among controlled oxidisers.
AP-SRC-002

Ariane 5 boosters (EAP)

European Space Agency · Date not published

OFFICIAL PROGRAMME TECHNICAL PROFILE · accessed 2026-08-28

Open public source →
  • Ariane 5 boosters — propellant constituentsESA assigns oxidiser, reducer and binder roles to AP, aluminium and polybutadiene.
AP-SRC-003

ArianeGroup's Main Industrial Sites

ArianeGroup · Date not published

FIRST PARTY FACILITY PROFILE · accessed 2026-08-28

Open public source →
  • Toulouse site sectionThe current facility page identifies Toulouse AP development and production for Ariane 6 and M51 but gives no annual tonnes.
  • Saint-Médard-en-Jalles Centre site sectionThe site page identifies M51-linked AP transformation and the attached Sainte-Hélène processing and storage site.
AP-SRC-004

Ammonium Perchlorate — Space Propulsion

ArianeGroup · Date not published

FIRST PARTY PRODUCT SPECIFICATION · accessed 2026-08-28

Open public source →
  • Pages 1–2 — product role, typical analysis and associated servicesThe product sheet covers AP synthesis, particle sizes and distribution, hazards, logistics and customer services without an annual capacity or allocation figure.
AP-SRC-005

Installations classées — ARIANEGROUP Toulouse

Géorisques — French Ministry for Ecological Transition · Date not published

OFFICIAL FACILITY REGISTER · accessed 2026-08-28

Open public source →
  • Establishment header and rubrique 4749The official register marks the Toulouse establishment operating with authorisation, Seveso upper-tier and authorised for ammonium perchlorate.
AP-SRC-006

Perchlorate d'ammonium (7790-98-9)

INERIS · 29 March 2024

OFFICIAL TECHNICAL SUBSTANCE PROFILE · accessed 2026-08-28

Open public source →
  • Données économiques — production and capacity paragraphsINERIS retains the historic sole-European-manufacturer statement and dated Toulouse capacity and production values.
AP-SRC-007

Porter à connaissance relatif au projet Stockage de PS — Établissement de Sainte Hélène

Préfecture de la Gironde / ArianeGroup · 26 June 2024

REGULATORY APPLICATION · accessed 2026-08-28

Open public source →
  • Section 1 Introduction — current activities and project objectiveThe filing describes authorised AP storage and mixing and proposes a two-month sodium-perchlorate buffer based on 28 t/day to secure Toulouse production.
AP-SRC-008

N° 27–1995: Ariane-5 on the way to flight qualification

European Space Agency · 24 July 1995

OFFICIAL PROGRAMME QUALIFICATION ANNOUNCEMENT · accessed 2026-08-28

Open public source →
  • Paragraph 3 — European AP source and dual procurementESA links a satisfactory booster qualification test using European-source AP to future dual procurement.
AP-SRC-009

Les usines de production

Centre Spatial Guyanais / CNES · Date not published

OFFICIAL FACILITY PROCESS PROFILE · accessed 2026-08-28

Open public source →
  • Usine de Propergol de Guyane descriptionCNES describes mixing aluminium powder, AP and polybutadiene resin in the downstream solid-propellant plant.
AP-SRC-010

Defence system dismantling and decontamination

ArianeGroup · Date not published

FIRST PARTY PROCESS PROFILE · accessed 2026-08-28

Open public source →
  • Licorne biological treatment facilityArianeGroup reports 300 t/y AP elimination capability at Saint-Médard, an end-of-life throughput distinct from production.
AP-SRC-011

À Toulouse, ArianeGroup augmente discrètement la production de perchlorate d'ammonium de son usine

Mediacités · 8 June 2026

INVESTIGATIVE REPORTING FROM PROJECT DOCUMENTS · accessed 2026-08-28

Open public source →
  • Article body — reported 5,000 t/y annual production and 8,000 t/y project targetThe investigation reports annual production of 5,000 t/y and a project target of 8,000 t/y after a second workshop, a planned 3,000 t/y increase.
AP-SRC-012

Permis de construire ArianeGroup, 19 chemin de la Loge, Toulouse

Service des données et études statistiques — Sitadel · 9 April 2026

OFFICIAL CONSTRUCTION PERMIT DATA · accessed 2026-08-28

Open public source →
  • Permit 0315552500683 — decision date and industrial surface fieldsThe official row records authorisation on 9 April 2026 and 2,094 square metres of newly created industrial surface at the ArianeGroup address.
AP-SRC-013

Jarrie — site de production

Arkema · Date not published

FIRST PARTY FACILITY PROFILE · accessed 2026-08-28

Open public source →
  • Jarrie production-site page — products and applicationsArkema lists sodium perchlorate at Jarrie and identifies it as an input for Ariane rocket fuel; the site's aggregate production figure is not product-specific.

Revision history

DateVersionChange
2026-08-280.1.0Initial moving-current AP publication: Toulouse synthesis and reported 5,000 t/y annual-production baseline retained outside capacity, reported 3,000 t/y project increase with official permit corroboration, Gironde conditioning and storage, Jarrie sodium-perchlorate input, historic-capacity boundary, upstream buffer, particle-distribution gate and historic qualification evidence.
Publication boundary. SB-SMP-0003 identifies this analytical publication. It does not create a parallel canonical material identity or add a product to the released Industrial Network. The public Industrial Network remains industrial-network-api-v0.1 over released industrial-network-v0.2.