Strategic Baseby Eurostatecraft
Poland · Productive–Industrial

Productive–Industrial Stock

A bounded register of 25 strategically consequential establishments across ammunition, ground systems, aviation, naval production and electronic systems. It records what physical capability and expansion evidence establish—and what they do not.

Stock register, not industrial census.No national total, output estimate, composite capacity score, future, or Human × facility multiplication.
Verifying release…Channel and immutable manifest are checked before the register is shown.
Reviewed registerselected establishments
Annual capacityfacility with installed rate
Actual outputrealised-output series
Coverage boundaryexplicit register-wide gaps
Facilities · physical capability · evidence

Selected strategic establishments

The index is verified first. Open an establishment to fetch its immutable evidence chunk, including expansion/ramp facets where published.

Expansion is evidence, not capacity

Announcements, capital, lines and commissioning remain distinct

Poland's visible investment cycle is represented as seven separate facets inside each facility: project announced, capital commitment, new line, commissioning, installed capacity, utilisation and realised output.

InvestmentDoes not establish installed capacity.

Planned lineDoes not become an operational line.

Contract quantityDoes not become annual output capacity.

PGZ employmentDoes not become facility workforce.

National occupationsDo not become locally available labour.

CommissioningDoes not establish utilisation or realised output.

Unknowns are product data

What the register cannot currently establish

“Not observable” is not zero, not absence of capability, and not a transport error. Load the checked release-wide gaps to inspect the exact boundary.

Evidence descent

Primary-source claims at their actual grain

FacilityDoes not prove current utilisation or readiness.

CapabilityDoes not prove actual output.

CapacityDoes not prove realised production.

Industrial NetworkOnly released v0.2 facts are imported; draft v0.3 and migration 0017 are excluded.

Source boundary pending release verification.